• Don’t be afraid to delete some elements from your backlog while retaining the appropriate characteristics. This will guarantee optimal results.  Don’t lose control because of non-stop brainstorming.

  • Lists are difficult to follow when too long. This overloads your team and creates stress.

  • Find the correct balance between new ideas (brought through brainstorming) and reasonable length backlog lists.

Plan de travail 1

For you today

our document on the 6 steps to do a SWOT analysis!

Type in your information and get access to the document

Not yet a member?

Congratulations!

Well Done,
You can access the pdf!

Feel free to follow our link and learn more about the BA Toolkit.